Major repairs are underway on the bridge over the Teteriv River on road T-10-05, which suffered severe damage and destruction due to shelling during the early stages of the full-scale invasion by the russian federation in 2022.

Initially, specialists dismantled the destroyed and damaged structural elements of the bridge. Bored piles were also installed under two abutments, and concrete bedding was laid for the beam structures. The full scope of work to reinforce the beams of nine supports with reinforced concrete frameworks has already been completed. Preparations are now underway to reinforce the beam of another intermediate support.
In addition, work continues on installing reinforcement frameworks, formwork and concreting of the sub-beams under the main span girders.
The major repair of the bridge is being carried out as part of a pilot project covering priority infrastructure sites in the Kyiv region, with financial support from UK EXPORT FINANCE.