Work is continuing on the restoration of sections of the critically important M-18 highway which connects Dnipropetrovsk, Kharkiv and Zaporizhzhia regions. This road is of strategic importance for logistics, ensuring the rapid delivery of humanitarian cargo.

What has already been done:
- elimination of potholes in the asphalt pavement – 1,400 m²;
- cold milling – 57,836 m²;
- demolition of road pavements and foundations – 2,860 m²;
- installation of a two-layer base made of blast furnace slag with a thickness of 20 cm – 2,860 m²;
- installation of a road base made of a cement-treated gravel-sand mixture with a layer thickness of 15 cm – 2,668 m²;
- construction of a leveling layer of road pavement from asphalt concrete mixture using an asphalt paver – 2,636 m²;
- construction of a layer of road pavement from asphalt concrete mixture – 47,603 m²;
- reinforcement of road shoulders with asphalt granulate – 7,136 m².