The work has been completed on an area of almost 155,000 square meters. We worked on areas with the most extensive destruction of the road surface. Almost 140,000 square meters were repaired using the large mapping method and 15,000 square meters were repaired by patching.

The total cost of the works is UAH 210 million.
Patching repairs are underway in some areas, using hot asphalt mix and vacuum jetting.
The H-12 Sumy-Poltava highway connects Sumy and Poltava regions. The military is moving to the northern frontline territories along this route. Humanitarian, medical and evacuation flights go to Poltava mainly by this road. About 5,000 vehicles pass through every day.