First Deputy Head of the Agency for Restoration Mykola Boiko made a working trip to Borodianka together with representatives of the Service for Restoration and Development of Infrastructure in Kyiv oblast and a contractor.
Work is actively underway on Tsentralna Street. Milling of the asphalt concrete pavement and dismantling of the curb stone on one of the sections have already been completed. Currently specialists are continuing to dismantle the soil-gravel base of the road surface. The installation of a storm sewer and rainwater drainage system is underway. At the same time gas supply pipes are being laid.
We are carrying out this work as part of a pilot project for the comprehensive restoration of settlements affected by russian armed aggression.

“Borodianka should be modern and convenient for all residents. Therefore, the street will have modern public transport stops with digital displays, free Wi-Fi, video surveillance cameras and emergency call buttons, as well as safe crossings, convenient sidewalks, and landscaping,” emphasized Mykola Boiko.
Part of the street is temporarily closed due to the work being carried out. We ask residents to be understanding of the temporary inconvenience.
