Back
News

We are conducting emergency road repairs in Kirovohrad Oblast: nearly 51,000 m² of road surface deformations have already been eliminated

Roads and bridges
Kirovohrad

 We continue maintenance of public roads of national importance. Currently, works are focused on routes with the highest traffic volumes and key logistical corridors.
We are actively restoring the pavement on major highways in Kirovohrad Oblast. Road workers are using two methods simultaneously – hot asphalt concrete and jet patching.
Since the beginning of the year, 50,880 m² of road surface deformations have been eliminated, including 18.7 thousand m² using the jet patching method.
In particular, surface deformations are being eliminated on the following roads:

  • M-30 — where the road surface was worn out and no repairs had been carried out in recent years
  • M-13 — capital repairs were planned but could not be implemented due to the full-scale invasion
  • M-22 and H-14 — roads that have only been partially repaired
  • H-01 and H-08 — roads that are only scheduled for repair in the coming years, but due to high traffic intensity, have significant deformations.
Privacy Overview
Агентство відновлення

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.